Working at height
Overhead piping runs above finished floors and live equipment. We plan lifts, laydown and access before mobilizing so the floor stays protected.
Mission-critical mechanical · Louisiana & the Gulf South
Complete Mechanical Contractors installs the technical water, process cooling and central plant piping that keeps data centers running, from the first model to the final flush.
Data center work is repetitive by design: the same systems, room after room. We plan for that repetition so crews, material and schedule move together, and we protect the finished building while we work in it.
| Line tag | System | What we deliver |
|---|---|---|
| TW | Technical water | Supply and return piping for liquid-cooled IT equipment, installed to the engineer's routing and the coordinated drawings. |
| CHW / CW | Central plant | Chilled water and condenser water piping, pumps and tie-ins between plant equipment and distribution. |
| SS | Stainless piping | TIG-welded stainless lines where the specification calls for them, with cleaning and passivation per spec. |
| OFCI | Owner-furnished material | Receiving, tagging and installing owner-furnished pipe and equipment to the coordinated drawings. |
| SUPT | Supports & hangers | Supports and hangers built to the engineer's details and the approved submittals. |
| TEST | Testing & flushing | Pressure testing, flushing and fill per the specification, documented for commissioning. |
Overhead piping runs above finished floors and live equipment. We plan lifts, laydown and access before mobilizing so the floor stays protected.
When hot work inside the building is restricted, we plan for more of the welding to happen off site and bring piping in ready to set.
Scope, support details and owner-furnished material are clarified in writing before we sign, so there are no surprises at closeout.
We carry the piping scope from preconstruction through commissioning support, so the general contractor has one accountable mechanical team on site.
Closed-loop cooling water for data halls, process equipment and critical environments.
Chilled water, condenser water and heating hot water systems tied into existing infrastructure.
TIG welding, cleanliness controls and passivation per spec for systems that can't tolerate contamination.
Spools and assemblies built off site where the project allows, tagged to the drawings and delivered when the site needs them.
Working from the coordinated model with the design team and other trades before anything is fabricated.
Pressure testing, flush and fill, and closeout documentation handed over ready for commissioning.
Welding a spool on a stand beats welding it overhead above a finished floor. Where the project allows, we move work off site and deliver it tagged and ready to set.
Every project follows the same sequence. Most problems on a critical job are cheaper to solve in the model or the contract than in the field.
Constructability review, scope clarifications and long-lead procurement.
Clash review with the design team and every trade in the space.
Spools and assemblies built off site where the project allows.
Repeatable install sequences, area by area, with daily progress tracking.
Pressure testing, flushing and fill to spec.
Documentation, as-builts and support through commissioning.
Safety is planned into the job the same way the piping is: before the work starts, by the people doing it.
We're building crews for mission-critical work in Louisiana. If you take pride in clean welds and straight runs, we want to talk.
Apply nowOr email [email protected]
Send us drawings, a scope, a bid invitation or just a question.
Office
3121 Country Club Rd, Suite A
Lake Charles, LA 70605
Phone
Service area
Louisiana and the Gulf South